Code for installation of solar power supply system engineering (management system)

Code for installation of solar power supply system engineering (management system)Project installation code

I. check and check the tools required for installation

II. Check and verify relevant products of the project

1. Specification and model of solar panel

2. Battery Specification and model

3. Controller specification and model

4. Specification and model of solar panel cable

5. Battery box

6. Specification and model of battery cable

7. Metal hose sheath

8. Inverter

9. Material transportation: circuit breaker, wiring terminal, lightning protector, guide rail, adhesive tape and plaster. 3. Check the safety wear of helmet reflective vest, and repair or replace it in time in case of any damage. Everyone should wear safety helmet and reflective vest before departure.

IV. road construction safety signs shall be placed in strict accordance with relevant regulations.

V. check each screw after installing the bracket, and do not forget or untighten the screw.

Vi. if it is necessary for the installation personnel to climb, the installation personnel shall first fasten the safety belt for operation when climbing to the required position.

VII. When lifting and fixing the solar powered support on the column, there shall be no personnel under the operation range. Personnel can not enter the installation until the installation is completed.

VIII. The battery and battery box shall be installed in strict accordance with the factory requirements and drawings.

IX. relevant equipment in the distribution box shall be installed by professional personnel, and the short circuit of a battery cannot be recorded. All exposed cables shall be sheathed with metal hose.

X. check whether the system is normal after installation.

Xi. Do not forget the inspection tools at the installation site. In case of expressway project, the construction safety sign shall be taken back according to the relevant rules of expressway construction safety.

12. After the completion of the project installation, check the tools, check the list of main parts and accessories left and bring it back to the company after no doubt.

XIII. The person in charge of the project shall return to the company after the customer confirms that the project has passed the acceptance.

CATEGORIES

    CONTACT US

    Contact: Micah.Zhang

    Phone: 400 6400 262

    Tel: 86-29-85535392

    Email: info@okeyset.com

    Add: No.4, Shixiang Road, Xi an City, Shaanxi Province, China

    Scan the qr codeClose
    the qr code